After the large scale flooding to parts of the Lake District and the UK, Ascot Services Limited were appointed to carry out flood repairs to all of the FFC flood damaged properties, consisting of 6 houses and 8 bungalows.
Ascot had previously carried out various works on site and were recommended by the facilities manager to the Loss Adjusters to carry out the repairs. Ascot produced a detailed specification of works for each property and a programme.
The programme was produced to assist the FFC to re-occupy the properties. All the works were completed on time and to budget. Ascot assisted the drying company in ascertaining the floor structure. This helped the drying process and Ascot specified a DPM system for the floor, which prevented future problems.
Project duration 15 months
Bright Horizons are an American owned Childcare provider with a portfolio of Circa 300 Children’s Nurseries throughout the UK, making them one of the leading childcare providers in the country. With a demand of constant...
Find out moreThe scope of works for BT Bradford Refurbishment was to take a disused warehouse on the Legrams Lane site and create a bespoke Fibre Training Room Facility. The facility was to include 9 Training Rooms,...
Find out moreThe largest UK general insurer, Direct Line Group (DLG), as part of their property strategy, had decided to ....
Find out moreThe Fire Fighters Charity (FFC) provide a modern day service that provides life enhancing health and wellbeing support to the whole fire community. The FFC are proud to support everyday firefighting heroes. They provide accommodation...
Find out moreFollowing appointment to become the Main FM service partner to Genting Casino UK in 2015, Ascot Services undertook detailed dilapidation surveys of the client’s estate via our in house expert engineering team. The information provided...
Find out moreThe Great Lever Children’s Centre is one of several Bolton Council owned and run Start Well Centres which operate all across the borough with the aim of supporting families
Find out moreWe were instructed to design and deliver a full refurbishment of a new Warehouse to create a secure, accessible, energy efficient work space.
Find out moreIn Conjunction with Total Swimming, Ascot Services have been appointed as the main contractor for a Design & Build project to construct the new 50m swimming facility adjacent to the existing Becontree leisure centre on...
Find out more© Ascot Services 2024